Case study
Reverse engineering an imported Hastelloy recovery trough for a fibre plantAt a glance: fibre manufacturing. Recovery trough in Hastelloy C-22. The original was imported and came with no drawings. Our scope covered…
Four 25-metre SS 316L washing towers, built alongside the original overseas supplierAt a glance: four washing towers in SS 316L, each 4,000 mm in diameter and 25 metres long, with trays. The original towers were imported…
Case studies
Equipment we have designed, fabricated and tested: what was asked for, and how we built it.
Reverse engineering an imported Hastelloy recovery trough for a fibre plantAt a glance: fibre manufacturing. Recovery trough in Hastelloy C-22. The original was imported and came with no drawings. Our scope covered…
Four 25-metre SS 316L washing towers, built alongside the original overseas supplierAt a glance: four washing towers in SS 316L, each 4,000 mm in diameter and 25 metres long, with trays. The original towers were imported…